Project Scope:
- Installation of 23 Bollards
- Removal of 7 Existing Concrete Pads
- 157 LF of Asphalt Removal & Replacement
- 1,578 LF of Excavation & Backfill for Electric
- 1,380 LF of Landscape Restoration
- Installation of 2 Concrete Switch Gear Pads
- Installation of 23 Concrete EV Charger Pads
Project Summary:
This project consists of installing EV charges at multiple locations on a pharmaceutical manufacturing campus. The scope of work includes demolition of existing features, excavation of conduit trenches and pedestal foundations, forming and pouring concrete for foundations, backfilling open excavations, and site restorations.