Project Scope:
- 1,800 SF of Asphalt Demolition
- 800 CY of Earthwork
- 180 LF of Drainage Pipe
- 4 Drainage Inlets
- 1 Building Prep
- 1,400 SF of Asphalt Installation
Project Summary:
This project consists of complete civil sitework for the West Point Storage Facility, including demolition of existing pavement, earthwork operations, installation of storm drainage and water systems, and preparation of the building pad and surrounding infrastructure. Work also includes concrete improvements, pavement restoration, and full site stabilization.
Construction is driven by tight coordination with ongoing operations and structural work, requiring efficient logistics, precise grading, and timely installation of underground systems to maintain progress and minimize disruptions throughout the project.