Project Scope:
- 7,200 LF of Electrical and Communication Duct Bank Excavation & Backfill
- 2,900 LF of Directional Drilling
- 21 Electrical Precast Manholes
- 1 Switchgear Pad
- 10,100 LF of Restoration
Project Summary:
Electrical and communication duct bank civil support including excavation, sand bedding, select backfill of trenches. Furnish and install 21 precast electrical/comm manholes. Horizontal directional drill through environmentally sensitive easements which included a challenging rock drill through ledge rock.